HVAC, explained
Adding air conditioning to a commercial generator
Yes, a commercial generator can power cooling equipment such as the Trane rental chiller that requires 460-volt, three-phase power (Trane). Generac says to size for the demand at startup as well as in operation, and to account for drops in voltage and frequency and for harmonic distortion (Generac).
Cummins advises collecting details about the loads and the site before a generator is sized (Cummins). If several loads have to come back after transfer, Cummins recommends staging their starts to reduce the peak starting demand on the generator (Cummins).
What the generator has to handle
Generac says a motor can briefly pull the voltage down when the alternator supplies the initial surge of current (Generac). The engine can also slow temporarily if it cannot deliver the kW the loads demand, lowering the electrical frequency until the engine recovers (Generac). Generac says most NEMA motors can tolerate a voltage drop of up to 30 percent, though a drop greater than 15 percent can cause some other equipment in the building to reset (Generac). The tolerances of the loads already on backup power are part of the sizing decision because different loads can tolerate different levels of disturbance (Generac).
Starting demand and running demand
Cummins says that at full-voltage startup, a motor typically draws six times its rated full-load current, and the surge stays high until the motor is turning at roughly 75 percent of its rated speed (Cummins). Generac gives the example of a 100-horsepower NEMA Code G motor that requires an alternator capable of delivering 600 starting kVA, with a demand of 100 kVA once the motor is running (Generac). For NEMA Code G motors, Generac estimates engine starting kW at about twice the numerical horsepower rating (Generac). Cummins uses the motor nameplate to model starting behavior, including horsepower, voltage, phase, frequency and the NEMA code (Cummins).
Which loads restart first
Cummins recommends restoring critical loads first, then starting larger loads before smaller ones, with 5 to 10 seconds between steps to let the generator recover (Cummins). Generac illustrates the effect with three 100-horsepower motors in which starting each motor in turn cuts the starting kW requirement by 40 percent compared with starting all three together (Generac). Cummins lists multiple transfer switches and programmable controls among the ways to implement a sequence (Cummins).
Soft starters and variable frequency drives
Generac says some soft starters gradually increase voltage while limiting current to a configured value that determines the generator size needed (Generac). It says stepping the voltage rather than ramping it may result in load steps that can create transients (Generac). For its 25- to 40-ton ZP*KW scroll compressors, Copeland says a soft starter can reduce the startup surge and that the ramp should take no longer than 3 seconds (Copeland). Copeland calls for following the starter manufacturer's selection criteria, including compressor current, ambient temperature and starts per hour (Copeland). For mobile generator sizing with a variable frequency drive, Generac calls for drive nameplate data and recommends finding out whether the drive has harmonic filtering, since its nonlinear current can distort the generator voltage (Generac).
What changes with the cooling equipment
Trane specifies 460-volt, three-phase power from the building or a generator for the rental chiller covered by its startup instructions (Trane). The same unit uses 115-volt shore power for the controls and compressor crankcase heaters until 460-volt power is available (Trane). For commercial air handlers with an economizer, PNNL says the system can reduce the mechanical cooling required by admitting more outdoor air when it takes less energy to cool than return air (PNNL). PNNL says an economizer can use outdoor temperature or enthalpy, which accounts for both temperature and humidity, to decide when to operate (PNNL). Humidity sensors used for that purpose need regular calibration because errors can make the economizer operate incorrectly (PNNL).
Cooling for data equipment
ASHRAE recommends an inlet dry-bulb temperature of 18 to 27 degrees Celsius for operating equipment in classes A1 through A4, with dew points from minus 9 to 15 degrees Celsius and a relative humidity ceiling that depends on corrosion test results (ASHRAE). ASHRAE gives separate allowable operating dry-bulb ranges of 15 to 32 degrees Celsius for A1, 10 to 35 for A2, 5 to 40 for A3 and 5 to 45 for A4 (ASHRAE). For those classes, ASHRAE limits the change in inlet temperature to 5 degrees Celsius within an hour for tape storage (ASHRAE). For other IT equipment in those classes the limits are 20 degrees Celsius within an hour and 5 degrees Celsius within any 15 minutes, measured as the difference between the highest and lowest inlet readings in the interval (ASHRAE).
Generator safety at the building
Never make a direct connection between a generator and the building wiring without a transfer switch installed by a qualified electrician (OSHA). OSHA warns that without isolation, a generator connected to a building's wiring may energize the utility lines, putting utility workers and others nearby at risk of electrocution (OSHA). Never run a generator indoors or in any enclosed space, including a garage or basement. Opening doors and windows may fail to stop carbon monoxide from accumulating (OSHA). Keep a running portable generator away from outdoor openings that could let carbon monoxide inside, including vents, doors and windows (OSHA).
Frequently asked
Can I size the generator from the AC’s running load?
Include startup demand too (Generac). Generac uses starting kVA to account for the power the alternator has to supply as the motor comes up to speed (Generac).
Can a generator power a rental chiller?
Yes. Trane allows generator power for the rental chiller in its startup instructions and calls for a three-phase 460-volt supply for that unit (Trane).
Can we use temperature-only economizer control?
Maybe. PNNL says switching to a dry-bulb temperature limit may improve operation when a facility lacks the resources to calibrate humidity sensors regularly (PNNL).
What temperature does ASHRAE recommend for high-density servers?
For its H1 high-density air-cooled class, ASHRAE recommends 18 to 22 degrees Celsius dry bulb at the equipment inlet during operation (ASHRAE).
Do I need to call a pro for this?
Yes. The work belongs to a licensed contractor. A qualified electrician must install the transfer switch before a generator can be connected directly to building wiring (OSHA).
Related
- Walk-in cooler and freezer during a power outage
- Chiller System: How It Works and Whether It Fits a Building
- Rooftop Unit (RTU): What It Is and How It Works
- Industrial Air Conditioners: Types and How to Tell Them Apart
- Running an AC on a home generator: load management
- Generator carbon monoxide and backfeeding: safe placement and wiring
- Air conditioner starting current and generator size
- Server room and data room cooling on generator power
Need a generator supplied, or the cooling equipment serviced? Blume can supply a generator; the electrical installation is referred to a licensed electrician. Blume Mechanical Service, license CAC-1822618, serves Pinellas, Hillsborough and Pasco counties.
Sources: Generac, Sizing Considerations for Commercial and Industrial Generators, https://www.generac.com/globalassets/pdfs/industrial/whitepapers/sizing-considerations-for-comm-and-ind-gens.pdf · Generac, Basic Sizing for Mobile Generators, https://www.generac.com/globalassets/pdfs/industrial/whitepapers/basic-sizing-for-mobile-generators.pdf · Cummins, Generator Set Sizing Software: Transient Performance and Motor Load Capabilities, https://www.cummins.com/sites/default/files/2020-03/PowerHour_Generator%20Set%20Sizing%20Software_Transient%20Performance%20and%20Motor%20Load%20Capabilities%20(1PDH).pdf · Copeland, Application Engineering Bulletin AE4-1401 R2, 25 to 40 Ton ZP*KW Scroll Air Conditioning Compressors, https://webapps.copeland.com/online-product-information/Publication/LaunchPDF?Index=AEB&PDF=1401 · Trane Technologies, Start-Up Instructions, Trane Rental Services SRV-SVN015A-EN, https://elibrary.tranetechnologies.com/public/commercial-hvac/Literature/Installation/SRV-SVN015A-EN_05202023.pdf · ASHRAE TC 9.9, 2021 Equipment Thermal Guidelines for Data Processing Environments Reference Card, https://www.ashrae.org/file%20library/technical%20resources/bookstore/supplemental%20files/therm-gdlns-5th-r-e-refcard.pdf · Pacific Northwest National Laboratory, Best Practices for Air-Side Economizers Operation and Maintenance, https://www.pnnl.gov/projects/om-best-practices/air-side-economizers · OSHA, Assessment, Cleanup, and Repair of Structures, https://www.osha.gov/etools/hurricane/activity-sheets/building/clean-up-repair