Blume Mechanical ServiceBlumeMechanical Service

HVAC, explained

Variable Refrigerant Flow

A variable refrigerant flow (VRF) system serves individual zones of a building with heat pumps, refrigerant piping and branch controllers (Yale). LBL describes the layout as generally one outdoor unit serving several indoor units through a network of refrigerant pipes (LBL). The federal definition in 10 CFR 431.92, as DOE quotes it, covers commercial package air-conditioning equipment with a single refrigerant circuit, one or more outdoor units, and several indoor fan coil units that can run independently of one another (DOE).

Variable refrigerant flow appears in federal rules from DOE and EPA and in Yale's own design standard (DOE, EPA, Yale).

How the system is built

Yale says VRF systems supply heating and cooling to individual zones and to air handling equipment in a building (Yale). The LBL study adds that a single outdoor unit with one or more compressors can connect as many as 60 indoor units of different capacities (LBL). The LBL study ties this to refrigerant mass flow that follows the cooling or heating load of each indoor unit (LBL).

Heat pump and heat recovery types

LBL names two common VRF types. The heat pump type gives either cooling or heating, not both at once, while the heat recovery type can give cooling and heating together (LBL). In LBL's China dataset of 287,992 VRF systems, every system is the heat pump type without heat recovery (LBL). DOE defines a VRF multi-split heat pump as commercial package equipment set up as a split system, which uses reverse-cycle refrigeration as its main heat source and may add supplemental heat from electrical resistance, steam, hot water or gas (DOE).

How capacity is controlled

DOE's wording implies three or more capacity-control steps on shared piping (DOE). Each indoor fan coil is metered and controlled on its own, and the units can run independently in response to several indoor thermostats (DOE). LBL says the same control opens the possibility of zone-level comfort, heating and cooling in different zones at once, and heat recovery between zones (LBL). Yale says that in the right application, VRF gives energy efficiency, installation flexibility, individual control and a way to decarbonize heating with electricity rather than fossil fuel (Yale).

Where VRF systems are used

LBL says VRF systems are widely applied in residential and office buildings in China (LBL). In the China dataset, residential and office buildings are the main building types, though building type is recorded for only a small share of the samples (LBL). Among building types in that dataset, duration of use was shortest in residential buildings and longest in hotels and medical buildings (LBL). LBL reports part-load operation as common in residential and office buildings in its China dataset, and attributes it to the part-time, part-space operation pattern (LBL). In LBL's measured study of five office buildings in China, VRF systems used much less air conditioning energy than VAV systems, and LBL puts this mainly down to far fewer operating hours (LBL). Those measurements cover the five buildings in China only (LBL). A simulated prototype office building in China showed less cooling load with the VRF operating mode than with the VAV mode, in the simulated Hong Kong and Qingdao cases (LBL). Yale says several of its VRF installs are in smaller-scale buildings and partial renovations (Yale). Yale's VRF design standard, released for spring 2023, is Yale's own guidance. It covers new construction and renovations, plus whole, partial and supplemental uses (Yale). EPA's VRF subsector covers water-source VRF systems of any capacity and air-source VRF systems of 65,000 BTU/hr (19 kW) or more (EPA).

Federal rules for VRF equipment

DOE's energy conservation standards for VRF air conditioners and heat pumps have applied to manufacturers since 2012 (DOE). Under 10 CFR 431.97, VRF air conditioners and heat pumps distributed in commerce must satisfy the energy conservation standards specified there (DOE). Manufacturers must use the test procedure methods at 10 CFR 431.96 to show compliance (DOE). EPA's December 12, 2024 final rule for the VRF subsector allows higher-GWP HFC equipment made or imported before January 1, 2026 to be put in place until January 1, 2027 (EPA). The rule also allows installation through January 1, 2028, for VRF equipment in construction projects that had an approved building permit before October 5, 2023 (EPA). EPA says certain VRF systems are covered by their own subsector rather than the residential and light commercial subsector (EPA).

Frequently asked

What is a variable refrigerant flow system?

Yale describes it as heat pumps, refrigerant piping and branch controllers that heat and cool individual zones (Yale). LBL describes the layout as one outdoor unit feeding several indoor units, with as many as 60 possible (LBL).

How does a VRF system control its output?

LBL says the system adjusts refrigerant flow with compressors that vary in speed and with expansion valves in each indoor unit (LBL). DOE's wording implies three or more capacity-control steps on shared piping (DOE).

Where are VRF systems used?

LBL's China dataset of 287,992 VRF systems lists residential and office buildings as the main building types (LBL). Yale says several of its own VRF installs are in smaller-scale buildings and partial renovations (Yale).

Do VRF systems have federal efficiency rules?

DOE says VRF air conditioners and heat pumps distributed in commerce must meet the energy conservation standards specified at 10 CFR 431.97 (DOE). Separately, EPA's FAQ says new VRF systems using an HFC with a GWP above 700 are allowed to be installed until January 1, 2027, if all components were manufactured or imported before January 1, 2026 (EPA).

Do I need to call a pro for this?

Maybe. The homeowner checks are the air filter, thermostat settings, and keeping things clear of the vents, returns and outdoor unit. Any refrigerant, electrical, gas, combustion or venting work needs a licensed contractor.

Related

Questions about a specific system can go to Blume Mechanical Service at (727) 330-9131.

Sources: U.S. Department of Energy, https://www.energy.gov/cmei/buildings/variable-refrigerant-flow-air-conditioners-and-heat-pumps · Yale University Office of Facilities, https://facilities.yale.edu/yale-releases-standards-ventilation-and-variable-refrigerant-flow-systems · U.S. EPA, https://www.epa.gov/hfcs/regulatory-actions-technology-transitions · U.S. EPA, https://www.epa.gov/hfcs/frequent-questions-phasedown-hydrofluorocarbons · Oak Ridge National Laboratory, https://info.ornl.gov/sites/publications/files/Pub56749.pdf · Lawrence Berkeley National Laboratory, https://eta-publications.lbl.gov/sites/default/files/t_hong_-_report_-_a_comparative_study_on_energy_performance_of_variable_refrigerant_flow_systems_and_variable_air_volume_systems_in_office_buildings.pdf · Lawrence Berkeley National Laboratory, https://eta-publications.lbl.gov/sites/default/files/operation_and_performance_of_vrf_systems-_mining_a_large-_scale_dataset_mqian.pdf

Search Google for variable refrigerant flow