HVAC, explained
Commercial building scheduling and controls
ENERGY STAR says the number one way to waste energy is to leave equipment and lights on when they could be off (ENERGY STAR). Control strategy or schedule improvements are where the greatest savings often occur, and they may take only a few hours to implement (ENERGY STAR).
Facility managers decide when heating, cooling and lighting run in a commercial building, mostly through schedules and control settings. ENERGY STAR treats operation as equal in importance to maintenance in O&M planning (ENERGY STAR). The sections below follow that guidance and cover checks that facility staff can make. ENERGY STAR says building equipment should be scheduled to run only as needed and periodically checked to prevent performance drift (ENERGY STAR).
Start with the schedule
ENERGY STAR calls leaving equipment and lights on when they could be off the number one way to waste energy (ENERGY STAR). It advises periodic reviews of HVAC and lighting schedules and set points so that equipment runs only when needed (ENERGY STAR). The payback for improved scheduling is almost immediate (ENERGY STAR). Many people can access lighting and HVAC controls, so schedules may be changed for a special need and never changed back unless preventive procedures are in place (ENERGY STAR).
Use the energy management system
An energy management system (EMS) can be programmed for optimal start/stop, night setback, night purge and morning warm-up (ENERGY STAR). These strategies can save energy dollars beyond ordinary time-of-day control (ENERGY STAR). Staff often use these systems only to turn equipment on and off (ENERGY STAR). Chilled and heating water resets are also listed among these strategies (ENERGY STAR).
Check for equipment running after hours
Managers can detect equipment left running after hours by entering the building during unoccupied hours (ENERGY STAR). ENERGY STAR advises building staff to perform an after-hours walk-through once every six months (ENERGY STAR). The walk-through should observe heating and cooling equipment, lighting, and office equipment such as copiers, printers and computers (ENERGY STAR). Portable dataloggers at the electric panels can track whether equipment is on when it should not be (ENERGY STAR).
Keep operation in the maintenance plan
The primary goal of a typical preventive maintenance plan is reliability and increased equipment life (ENERGY STAR). Poor equipment operation can lead to premature failure, such as short-cycling, and more maintenance work (ENERGY STAR). ENERGY STAR says the operation part of O&M should be treated as equal in importance to maintenance (ENERGY STAR). ENERGY STAR lists reducing early equipment failure and unscheduled down time as a goal of O&M work (ENERGY STAR).
Review control strategies with seasonal maintenance
Certain maintenance tasks prepare equipment for the heating or cooling season, and control strategies should be reviewed in the same way (ENERGY STAR). ENERGY STAR says control strategies should also be reviewed and adjusted (ENERGY STAR). O&M programs should include forms for tracking actual equipment performance against expected performance (ENERGY STAR).
Document every set point change
ENERGY STAR says sensor set-point, sensor location and control strategy changes should be documented whenever they occur (ENERGY STAR). Relying on memory can lead to mistakes that cost time and energy (ENERGY STAR). Control documentation is critical for maintaining energy-efficient operation and effectively troubleshooting operational problems (ENERGY STAR). Once accurate building documentation is obtained, it should be kept updated to maintain continuity (ENERGY STAR). Documenting the sequence of operation and control strategies is essential to understanding building control (ENERGY STAR).
Track savings to fund the next step
Savings can only accrue if recommendations from an O&M assessment are implemented (ENERGY STAR). Monitoring and tracking savings is required so they can be dedicated to future improvements (ENERGY STAR). ENERGY STAR says future energy efficiency work can be funded from savings generated by low-cost O&M improvements (ENERGY STAR). Confirm any financial treatment of these savings with your accountant or the utility serving the building. A rigorous O&M tune-up begins with a thorough assessment of current operation and maintenance practices (ENERGY STAR). The O&M tune-up may be the first step toward a sustainable finance mechanism for an organization (ENERGY STAR).
Know when to bring in a licensed contractor
Where the manufacturer's manual does not explain a control setting, check the manual or ask the manufacturer before changing it. A licensed contractor can review the controls and equipment schedules on site, and can confirm the settings that match the equipment. Keep a written record of each change so the next person can see what was set and why.
Frequently asked
What is the biggest source of energy waste in a commercial building?
ENERGY STAR says the number one way to waste energy is to leave equipment and lights on when they could be off (ENERGY STAR).
How quickly can schedule improvements pay off?
ENERGY STAR says the payback for improved scheduling is almost immediate (ENERGY STAR). Control strategy or schedule improvements may only take a few hours to implement (ENERGY STAR).
Can an energy management system do more than turn equipment on and off?
Yes, an energy management system can be programmed for optimal start/stop, night setback, night purge and morning warm-up (ENERGY STAR). Staff often use these systems only to turn equipment on and off (ENERGY STAR).
How often should staff check a building after hours?
ENERGY STAR advises building staff to perform an after-hours walk-through once every six months (ENERGY STAR). The walk-through should include heating, cooling, lighting and office equipment (ENERGY STAR). Portable dataloggers at the electric panels are listed as an alternative for tracking equipment that runs after hours (ENERGY STAR).
Why should schedule and set point changes be written down?
Relying on memory can lead to mistakes that cost time and energy (ENERGY STAR). ENERGY STAR says sensor set-point, sensor location and control strategy changes should be documented whenever they occur (ENERGY STAR).
Who should change a control setting the manual does not explain?
Check the equipment manual or ask the manufacturer first. A licensed contractor can review the controls on site and confirm the settings before any change is made.
Related
- Commercial HVAC seasonal maintenance checklist
- Backdraft and Trapped Pollutants After Sealing
- Indoor Air Quality at Home: How to Monitor It and How to Improve It
Need help with the HVAC controls or equipment schedules in a commercial building? Blume Mechanical Service (license CAC-1822618) repairs, installs and maintains HVAC and refrigeration equipment, is brand-agnostic, and serves Pinellas, Hillsborough and Pasco counties. Call 727-330-9131.
Sources: ENERGY STAR (U.S. EPA and DOE) — Operation and Maintenance Best Practices (https://www.energystar.gov/buildings/save-energy-commercial-buildings/ways-save/om-best-practices)