Blume Mechanical ServiceBlume MechanicalMechanical Service
Diagnostic, infrared thermometer

Pinellas, Hillsborough and Pasco Counties · Florida CAC-1822618

Emergency Chiller Service & Temporary Cooling in Tampa Bay

When a chiller goes down, the next step is a clear plan: diagnose the cause, protect the priority areas, and choose between repair, temporary cooling and replacement. Blume owns rental chillers.

License
FL CAC-1822618
Dispatch
24/7 emergency
Financing
Synchrony Bank

A chiller outage affects tenants, staff, customers and building operations at once. Facility managers need to know what failed, how much cooling remains and whether the system can be repaired or needs support. The answers come from the equipment and the connected plant, not from guesswork.

When your chiller goes down: the first steps

A chiller outage is stressful because it arrives with a lot of unknowns. Tenants are warm, staff are asking questions and nobody is sure whether this is a ten-minute problem or a ten-day one. The useful move is to gather a small set of facts and make a call. Blume offers 24/7 emergency dispatch for exactly this situation, and the better prepared the first call is, the more useful it is.

Before calling, note what the chiller's controller is displaying and photograph it if you can. Check whether power is present at the machine and whether any breaker has tripped, but do not keep resetting a unit that has shut itself down: a safety trip is information, and repeated restarts can erase it or damage the machine. Find out whether the pumps are running and whether the building automation system shows chilled-water temperatures climbing. Keep exterior doors closed, close blinds on sun-facing windows and shut down any nonessential heat sources, because those small steps buy comfort time while the plan is worked out.

Then call and say plainly what you know: the building, the equipment, what changed, and which areas matter most. A property manager who can say 'the data room and the lobby cannot wait, the upper floors can' has already helped the technician set priorities.

Diagnose first, then choose the path

A building that is losing cooling does not always need a new chiller. The cause could be the chiller itself, the pumps that move water through it, the tower or condenser that rejects its heat, the electrical supply, the controls, or equipment elsewhere in the system such as air handlers and valves. Each of those calls for a different response, and a wrong guess wastes the time the building does not have.

The on-site evaluation reads the controller's alarms and history, checks temperatures and pressures, and verifies power and flow with instruments. A technician then tells the owner what has been found and how confident the diagnosis is. Where specialist input or a part is needed, that is said plainly, along with what is and is not known about availability. For how a diagnostic call works in detail, see chiller repair.

While the diagnosis runs, the cooling plan runs in parallel. If part of the building can be isolated, or if the remaining equipment can carry a reduced load, that may protect critical areas right away. The goal in the first hours is a stable condition and an honest picture of what comes next.

Digital vacuum gauge reading 400 microns
Digital vacuum gauge reading 400 microns

Three paths back to cooling: repair, bridge, or replace

Once the cause is known, there are three realistic paths, and they are often combined.

Repair the machine. If the failure is repairable and parts are obtainable, repair is often the right answer, and the work is defined by what failed, the parts involved and the checks that prove the fix. Equipment and supplier questions are covered on the chiller replacement page.

Bridge with temporary cooling. When a repair needs time, a rental chiller can carry the building through. Blume owns rental chillers, including 120-ton chillers and smaller 20-ton and 40-ton chillers, and has a rental partner who supplies sizes in between. The mechanics of connection, power and pumping are covered on our temporary chiller rental page.

Replace the machine. If the chiller is at the end of its life or the failure is severe, replacement may be the right answer. Blume prices a replacement option alongside repair. Replacement planning is covered on chiller replacement.

One point that surprises owners: temporary cooling is not automatically cheaper than replacement. A long rental with extensive piping and power work can approach or exceed the cost of replacing the failed equipment. That is why the comparison belongs early, before the rental has been running for weeks.

Blume keeps working while temporary cooling runs

During an outage, the question every day is whether the permanent chiller can be brought back and what that will take. If the building has temporary cooling running and the permanent chiller sits dead, that question stays open until the machine is running again.

Blume keeps working on your chiller while temporary cooling runs, so if we can get it running or fixed, we are right there to do that. The return to the permanent plant is planned from the start, and when a rental period, a repair schedule and a replacement project overlap, the owner, the property manager, the equipment supplier and other trades all need the same startup date in front of them.

Power events and restarts

Timing matters: NOAA's National Hurricane Center states that "The Atlantic hurricane season runs from June 1 to November 30" (NOAA National Hurricane Center). If your building is exposed to tropical weather, plan for that window: know how to shut the plant down safely and how it restarts after a power interruption.

When power returns after an outage, the chiller and its pumps should not simply be slammed back on. A controlled restart checks supply voltage and phase, confirms that pumps and valves are in the right state, and brings equipment up in a sensible order. Controls that lost their time clock or setpoints during the outage may need to be checked and restored before the plant runs on its schedule. After a storm, outdoor equipment should be looked at for debris, water intrusion and physical damage before it is run.

If a storm is forecast, a short preparation list helps: confirm the chiller's controls and pumps are in good order, note how to shut the plant down safely, identify where a temporary chiller could connect, and know who to call. Preparation done before the forecast is cheaper than improvisation afterward.

Plan before the next outage: readiness and redundancy

The cheapest emergency is the one that has already been planned for. Most of the commercial accounts that Blume manages have redundant cooling that Blume installed or recommended, so on those accounts emergencies are not necessarily emergencies.

For buildings that do not have that arrangement, a readiness review can still reduce the pain. It documents where a temporary chiller could be placed, where it would connect to the chilled-water piping, what power is available, how a truck would reach the site and which areas need cooling first. In some buildings, adding a permanent connection point with isolation valves is a modest improvement that turns a day of improvised plumbing into a short hookup. These steps can be coordinated with capital planning; see HVAC capital planning.

What to send us when you request service

To work on your chiller with the right information, send the site address, a contact person, the equipment make and model, any alarm information, the areas affected and any recent service history. Photos of the nameplate and the controller display help a great deal. If the machine is part of a maintenance program, mention it, because the trended readings from earlier visits are a helpful baseline; see chiller maintenance service for what those records contain.

Call 727-330-9131 to reach Blume. If you are choosing between a repair, a rental and a replacement, tell us so, and Blume can help evaluate the next step.

Frequently asked

Do we need a rental chiller every time our system fails?

No. Some failures can be repaired without temporary equipment. A rental is considered when the expected downtime, the remaining capacity and the needs of the building justify it.

Can a temporary chiller fix every cooling problem?

No. Extra capacity does not correct problems with pumps, air handlers, controls or water distribution, so those are checked as part of the plan.

How do I request emergency chiller service?

Call 727-330-9131 with the building, the equipment and what the controller is showing.

Does Blume own rental chillers?

Blume owns some rental chillers, and a rental partner supplies other sizes. The details are on the temporary chiller rental page.

Can the building stay open during a replacement?

It depends on the building and the plan. Temporary cooling can support continued operation, and the limits and shutdown requirements are set out for the project.

Related

Unit converter

Showing 1 therm in 4 other units

Converted values for therm
UnitValue
Btu100,000
kWh29.31
MMBtu0.1000
Ccf (natural gas)0.9653

Used only for Ccf and therm conversions. Source: EIA, Heat Content of Natural Gas Consumed (U.S., 2025).

Sources: 1 therm = 100,000 Btu and 1 kWh = 3,412 Btu, from EIA. MMBtu from EIA. MBH from Wikipedia. 1 ton of refrigeration = 12,000 Btu/h from NIST. Ccf = 100 cubic feet from Wikipedia. — means no result for the current input.

Chiller down, or about to be? Call with the building, the equipment and what the controller is showing.

Call (727) 330-9131

References: NOAA National Hurricane Center, Atlantic hurricane climatology (nhc.noaa.gov)

Commercial HVAC maintenance · All service areas